国产成人av网站,亚洲精品91,精品国偷自产在线,亚洲毛片av在线

設(shè)為首頁 | 加入收藏    咨詢熱線:020-32201622  傳真號(hào)碼:020-32206671      最新產(chǎn)品honest|廣告刊登|商務(wù)團(tuán)隊(duì)|聯(lián)系我們 奧麗斯特
奧麗斯特燃?xì)庠O(shè)備 燃?xì)庠O(shè)備商城 燃?xì)庠O(shè)備選型 燃?xì)庠O(shè)備資料 工程技術(shù)咨詢
最新秒殺產(chǎn)品 專業(yè)企業(yè)網(wǎng)站制作、優(yōu)化、推廣 一元廣告區(qū) 最新電子商務(wù)咨詢
  奧麗斯特首頁 產(chǎn)品選型 燃?xì)赓Y訊 燃?xì)庹褂[ 企業(yè)導(dǎo)航 工程案例 資料下載 廣告服務(wù) 聯(lián)系我們 關(guān)于奧麗斯特   LNG管道供氣不促?
,日期:2025-06-08

位置:首頁 > 燃?xì)赓Y訊 > Liquiline to Build

Liquiline to Build LNG Bunkering Terminal for Fjord Line

瀏覽次數(shù) 637 , 日期 2014-08-22 , 燃?xì)庠O(shè)備 加入收藏

   Liquiline, an LNG fuel solutions provider, and Fjord Line have entered into a contract whereby Liquiline Europe AS will design, construct and commission an LNG ship bunkering terminal for Fjord Line AS at the Port of Hirtshals, Denmark. The terminal will be constructed at the Port of Hirtshals, where Fjord Line on a daily basis arrives with one of its two LNG-fuelled cruise ferries MS Stavangerfjord and MS Bergensfjord. This will be the first LNG ship bunkering terminal in Denmark.
   The ship bunkering terminal will be a Liquiline-designed LiquiStation® Bulk™ ST2FF. The terminal will have an on-site storage tank with a gross volume of 500m3 and a bunkering solution having a bunkering capacity of up to 400m3 of LNG per hour. This design will enable Fjord Line to bunker its ships within two hours, which is the time that the cruise ferries are docked at the port. The ship bunkering terminal is expected to be operational in Q4 2014.
   The two cruise ferries are trading between Norway and Denmark. They each have a capacity of 1,500 passengers and 600 cars, trucks and cargo. They are fitted with Rolls-Royce Marine gas engines. MS Stavangerfjord was commissioned and set in operation in July 2013. MS Bergensfjord was commissioned and set in operation in March 2014. The ships are sailing on the lines between Bergen, Stavanger and Hirtshals as well as Hirtshals and Langesund.
   Dag Lilletvedt, CEO of Liquiline Group, says in a comment: “We are very pleased with this agreement with Fjord Line, since it is based on our new LNG ship bunkering terminal design. In Fjord Line we get a strong and innovative industrial partner, being in the forefront of using LNG as bunker fuel in their new cruise ferries”.
   Gert Balling, Director of Fjord Line, stated that “Fjord Line is very much looking forward to have this LNG ship bunkering terminal from Liquiline established. It will enable us to bunker our ships quickly and give us the possibility to make use of this terminal commercially”. 

  圖片新聞             更多..


  • 西藏昂仁縣工商局

  • Iranian

  • Utrecht-

  • Light Du

  • Rock Reg

  • GasLiner

  最新資訊             更多..


 
注釋:[1]本網(wǎng)站部分資料參照與來源于網(wǎng)絡(luò)DMOZ中文網(wǎng)站分類目錄-免費(fèi)收錄各類優(yōu)秀網(wǎng)站的中文網(wǎng)站目錄.版權(quán)聲明:本站禁止任何形式的復(fù)制、盜8取本站設(shè)計(jì)樣式與內(nèi)容等.違者必究!網(wǎng)站法律顧問:ITLAW-莊毅雄律師
 
百度                                 
產(chǎn)品展示|國際品牌|企業(yè)導(dǎo)航|燃?xì)庑畔最新展會(huì)|商務(wù)團(tuán)隊(duì)|人才招聘|資料下載|廣告服務(wù)|聯(lián)系我們|關(guān)鍵字|友情連接|   
主站蜘蛛池模板: 安远县| 安龙县| 来安县| 惠东县| 西乌珠穆沁旗| 宣武区| 静海县| 遵化市| 集贤县| 辛集市| 新晃| 兴义市| 夏津县| 泸州市| 金沙县| 葫芦岛市| 华安县| 拜城县| 沁源县| 东乡| 富裕县| 遂昌县| 陵水| 铜川市| 富平县| 聂荣县| 罗山县| 屏边| 达日县| 于田县| 增城市| 渭南市| 忻州市| 富锦市| 大宁县| 黑龙江省| 平湖市| 庆安县| 桐城市| 常州市| 凤城市|