国产成人av网站,亚洲精品91,精品国偷自产在线,亚洲毛片av在线

設為首頁 | 加入收藏    咨詢熱線:020-32201622  傳真號碼:020-32206671      最新產品honest|廣告刊登|商務團隊|聯系我們 奧麗斯特
奧麗斯特燃氣設備 燃氣設備商城 燃氣設備選型 燃氣設備資料 工程技術咨詢
最新秒殺產品 專業企業網站制作、優化、推廣 一元廣告區 最新電子商務咨詢
  奧麗斯特首頁 產品選型 燃氣資訊 燃氣展覽 企業導航 工程案例 資料下載 廣告服務 聯系我們 關于奧麗斯特   LNG管道供氣不促?
,日期:2025-08-02

位置:首頁 > 燃氣資訊 > Liquiline to Build

Liquiline to Build LNG Bunkering Terminal for Fjord Line

瀏覽次數 662 , 日期 2014-08-22 , 燃氣設備 加入收藏

   Liquiline, an LNG fuel solutions provider, and Fjord Line have entered into a contract whereby Liquiline Europe AS will design, construct and commission an LNG ship bunkering terminal for Fjord Line AS at the Port of Hirtshals, Denmark. The terminal will be constructed at the Port of Hirtshals, where Fjord Line on a daily basis arrives with one of its two LNG-fuelled cruise ferries MS Stavangerfjord and MS Bergensfjord. This will be the first LNG ship bunkering terminal in Denmark.
   The ship bunkering terminal will be a Liquiline-designed LiquiStation® Bulk™ ST2FF. The terminal will have an on-site storage tank with a gross volume of 500m3 and a bunkering solution having a bunkering capacity of up to 400m3 of LNG per hour. This design will enable Fjord Line to bunker its ships within two hours, which is the time that the cruise ferries are docked at the port. The ship bunkering terminal is expected to be operational in Q4 2014.
   The two cruise ferries are trading between Norway and Denmark. They each have a capacity of 1,500 passengers and 600 cars, trucks and cargo. They are fitted with Rolls-Royce Marine gas engines. MS Stavangerfjord was commissioned and set in operation in July 2013. MS Bergensfjord was commissioned and set in operation in March 2014. The ships are sailing on the lines between Bergen, Stavanger and Hirtshals as well as Hirtshals and Langesund.
   Dag Lilletvedt, CEO of Liquiline Group, says in a comment: “We are very pleased with this agreement with Fjord Line, since it is based on our new LNG ship bunkering terminal design. In Fjord Line we get a strong and innovative industrial partner, being in the forefront of using LNG as bunker fuel in their new cruise ferries”.
   Gert Balling, Director of Fjord Line, stated that “Fjord Line is very much looking forward to have this LNG ship bunkering terminal from Liquiline established. It will enable us to bunker our ships quickly and give us the possibility to make use of this terminal commercially”. 


打印  |  關閉
  圖片新聞             更多..


  • 西藏昂仁縣工商局

  • Iranian

  • Utrecht-

  • Light Du

  • Rock Reg

  • GasLiner

  最新資訊             更多..


 
注釋:[1]本網站部分資料參照與來源于網絡DMOZ中文網站分類目錄-免費收錄各類優秀網站的中文網站目錄.版權聲明:本站禁止任何形式的復制、盜8取本站設計樣式與內容等.違者必究!網站法律顧問:ITLAW-莊毅雄律師
 
百度                                 
產品展示|國際品牌|企業導航|燃氣信息|最新展會|商務團隊|人才招聘|資料下載|廣告服務|聯系我們|關鍵字|友情連接|   
主站蜘蛛池模板: 伊吾县| 中牟县| 界首市| 花垣县| 新田县| 南通市| 陇西县| 广宗县| 东阿县| 苏尼特左旗| 冕宁县| 平武县| 临洮县| 江源县| 屏东县| 四平市| 海门市| 兰州市| 花莲市| 固安县| 中江县| 南岸区| 邹城市| 洪泽县| 江川县| 习水县| 漳平市| 巴林右旗| 金山区| 汶上县| 临海市| 边坝县| 东源县| 太白县| 德保县| 天等县| 卢氏县| 焉耆| 鹤山市| 江永县| 康马县|